Page 1 of 1

M-WIP Scheduling Demo v5

Posted: Mon May 31, 2004 12:00 am
by Anonymous
This model and library demonstrate how M-WIP scheduling automatically calculates the release times that will minimize WIP while maximizing bottleneck utilization. I invite all simulationists to run this model and build others to test the effectiveness of M-WIP Scheduling. This demo of the Production library (v5) supports 300 blocks per model and expires 7/1/03. The Mfg Library is required to run the Demo model.